Piping and stack connection locations and sizes.   Technical data including temperature rating and arrangement of refractory and insulation.   Weights of unit and loading diagram of foundation. Evidence that contractor has coordinated support requirements with base design.   Recommended anchorage to foundation. Seismic requirements apply. Submit calculations by professional engineer.   Predicted external surface […]
Waste Heater Design TS150 PLC, Review Construction is dual/double combustion chamber with 02 sets oil burner, batch load  incineration equipment. Waste feed chamber is 1570Liters (1.57m3, TS150 PLC).  Primary & Secondary combustion chambers and smoke filter chamber.  Batch load on the bottom of chamber. Incinerator PLC panel control suit for local operation. Primary Combustion Chamber:  […]