Day: March 17, 2022

Fully automatic sequential control provided by internal Secondary chamber pre-heat Burn cycle (variable) Cool down cycle PLC system providing control of: Gas Alternatives Diesel, LPG, Natural or Bio Gas. Average Gas Consumption Diesel: 8 / 10 litres per hour Liquid Propane Gas: 6 / 8 litres per hour Natural Gas: 7 / 9 Nm3 per […]
Anchor all gear to building floor or construction as shown or as recommended by manufacturer with allowance for thermal expansion as required.   Control and Instrument Panel: Rigidly attach enclosure to structural element of the building. Locate panel so that all control switches and indicators are within 1700 mm (5.5 ft ) of the floor […]
Recent Posts