Capacity of destruction in weight 60 Kg/h

Quantity: Two [2] with complete accessories.

Kinds of wastes being used: GENERAL WASTE.Polyester, polypropylene, polystyrene, vinyl acetate plastic, synthetic

plastics,
– Assumption: general hospital beds 50 percent, surgery beds 50% for the 100 bed hospital instance, while this

ratio is 30-70% for the other cases
* Frontage of loading door seals gone up on hinges, wheel of screw plug, flexible joint, and stuffing insulating

from refractory.
* A secondary shot of air to ensure perfect oxygen content.
6.     The incinerator must avoid the discharge of black smoke and dust that is fine, (Smokeless) during the loadings.
* Burner with fuel, mono-bloc casting guiding type with flat flame, lighting and security of     electronic

ignition, permanent ventilation, electromagnetic sluice gate of regulation and isolating valve.
* Carcass in strong sheet steel with support of connection.
Natural rubber, synthetic rubber, polyurethane sheet, and bulky films, solids and
22. Process Filtering system: Scrubber to be cited as optional
– particles that can be easily sorted
* Electro-ventilator distributing the secondary atmosphere, the regulation of the air flow being carried out by valves and

after the control of the automatic cycle.
–  global standards and waste creations assumptions should employ
Would it be possible to give us information on the capacity of incinerator we want

on this island. Incinerator to dispose our daily normal mortality for this size of the farm.1. Can the

100kg/hr burn solid waste/hazardous waste like expired paints,waste oil or chemicals.
19.     A control box ensuring the whole cycle of combustion.

20.     Fan:
23. Emission Standards Compliance: BS 3316 or equivalent standard
– Chemical waste solids and liquids, waste oil and other difficult-to-handle items

The  machines will be certified for operation from PME after passing website investigations.Manual load twin chamber

incinerator for medical waste to burn 50kg/hr on continuous operation, with Main temperature in the area of

800degC minimal and 1200degC or more in the Secondary chamber, complete with charging doorway, Ash doorway, Air and see

vents, auxiliary air system with adjustable dampers, burners and burner control system and ignition device, the whole to

meet NEMA requirements and other global standards. Здравствуйте! Стоимость и доставка до г.Алматы Казахстан

The technical details we care about are:

–          Capacity (burning capacity of waste per hour). 150kg/hour. Incinerator with 300l waste chamber

–          Construct materials, 5mm High quality light steel structure; 100 mm high quality refractory lining.

–          High Temperature paint finish.we have two hospitals,more then 20 dentist offices,and over 50 doctor offices.
5.    
Nature: Calcium
•    The Temperatures of combustion: Minimum will be 850oC and max 1400oC
21.     Controls and regulations:

medical waste incinerator solutions and prices for 100 bed / 500 mattress / 1000 mattress / 3000 bed hospitals.
23.     The installed incinerator must endure a 1 year guarantee.
•    Post combustion: >1100oC.
16.     The supplier must provide  necessary information for the best of  the setup
* Burner of light of waste, with gas, regular mono-bloc casting guiding  plunging flame, lighting and security of

electronic ignition, permanent ventilation, electromagnetic sluice gate of regulation and isolating valve.
11.     The Inner diameter of the Chimney: Ø 400 and its height: 8 m
13.     The Dimension of the door for loading in cm: 70×70.
* A regulator with digital viewing for the temperature of combustion.
. Nature: 42 percent of Al203
4.     Design Specification : Types A, B, C, D, and E of medical waste
2.     It should be able to operate not less than 10 hours/day
Thickness    : ≥150 mm
* A timer with flexible temporization for the regulation of each burner.
22.     The supplier must give batches of spare pieces of first urgency and consumable of the incinerator.
* A sheath of evacuation of the gases burnt.
23. Capacity to treat Plastic: Not less than 40 percent by weight
•    Nature: Calcium silicate.
* The insulation of the combustion chamber should be composed of refractory bricks, having a high content of aluminium

and insulates bricks to be able to assure a minimum temperature on   the outside sheet metal.
* Electric box.

21. The de- ashing must be done in the base of the combustion chamber or the deashing must be Automatic or manual

batch p ashing.
9.     The incineration should be wholly free from visible smoke in addition to offensive odours.
14.    
.
15.     Fuel : diesel
Control box watertight to dust, including:

* A switch circuit breaker for each engine (ventilators and burners).
From the mill; it will include curative and preventative maintenance, and using machine, etc

18.     A chamber of post combustion of gases
3.     This incinerator must be able to destruct all combustible wastes produced by hospitals, private practices,

laboratories, institutes, etc…
* A burner of light which the use is restricted to the ignition of waste.
This incinerator with”PYROLYTIC” combustion must have:
Nature: 65% of Al203
8.     It should be able to hold emission in the second burn with gasoline residence of less than two seconds.
2. What about the heat generated during burning,are there windows or air flow into the containers.

–          Consumption of power and fuel. Hospital waste disposal system for a hospital job

–          Ash removal odor.The incinerator is for HAZARDOUS WASTE and SOLID WASTE and minimal carbon monoxide.

–          Automatic curing process temperature controlled chamber.Incinerator with 150l waste chamber

–          Secondary chamber. Have you got plans for above incinerators revealing floor dimensions,height. What materials should be used for the FLOOT, WALLS, ROOF ETC.1) The only consumable required for the system TS100

(PLC) is Oil( diesel) is that OK?

two ) from the technical specification: petroleum consumption (Kg/hour) is between 14–28) do you mean is liters/hour?

instance the incinerator will be operating for 10 hours per day means the oil consumption will be 140 Liters or more?

3) Chimney type stainless steel. How about main body construction materials?if there are more two option of body

construction materials for greater life

3. Send info about electricity, ventilation, fire protection, exhausts, chimney etc

4. Do you have prefabricated shelters?Installation of waste disposal system (biomedical) 500kg capacity model, MP 500

medical incinerator.

5. We see you have container shelters. Send us price quote for this thing

1.     Capacity of destruction in weight: 60 Kg/h.
– Items that readily degenerate such as paper, wood, leather and garbage
* A regulator with digital viewing for the temperature of post combustion.
25.     The technical training of operators will have to be supplied and given by a technician
17.     A combustion chamber of waste:
7.     It should be able to reduce the volume of wastes by 98%.

18.    A chamber of post combustion of gases
* A burner of combustion of gases,
* A device of injection of air allowing a total re-combustion of gases,
* A device of air inlet of cooling of waste gases,
* A sheath of evacuation of the gases burnt.
* Carcass in strong sheet steel with support of connection.
* Composition of the refractory;
•    Refractory concrete :
    Thickness    : ≥150 mm
    Nature: 65% of Al203
•    Insulate in fibrous panel :
    Thickness: ≥85 mm
     Nature: Calcium
* Burner with fuel, mono-bloc casting guiding type with horizontal flame, lighting and safety of     electronic

ignition, permanent ventilation, electromagnetic sluice gate of regulation and isolating valve.
* A secondary injection of air to ensure perfect oxygen content.
19.    A control box ensuring the complete cycle of combustion.

20.    Fan:
* Electro-ventilator distributing the secondary air, the regulation of the air flow being carried out by valves and

following the control of the automatic cycle.
21.    Controls and regulations:
Control box watertight to dust, including:

* A switch circuit breaker for each engine (ventilators and burners).
* A timer with adjustable temporization for the regulation of each burner.
* A regulator with digital watching for the temperature of combustion.
* A regulator with digital watching for the temperature of post combustion.
* Electric box.

21. The de- ashing must be done in the bottom of the combustion chamber or the deashing should be Automatic or manual

batch de ashing.
22. Process Filtering system: Scrubber to be mentioned as optional
23. Emission Standards Compliance: BS 3316 or equivalent standard
23. Capacity to treat Plastic: Not less than 40% by weight
24. CE Manufacturing Compliance: BS EN 746-2-1997
22.    The supplier must give batches of spare parts of first urgency and consumable of the incinerator.
23.    The installed incinerator must bear a one year guarantee.
24.    The supplier shall perform an onsite installation of the incinerator.
25.    The technical training of operators will have to be provided and given by a technician
from the factory; it will consist of curative and preventive maintenance, and the use of machine, etc