diesel oil fired medical waste incenerator

Heat Waste Incinerator Design D. MEGABYTES 750XL Melt Rate-150Kg/ hr minimal Weight( Kg) -4000 kg Added Chamber

(double chamber with post-burning) Gas Retention Time 2 2nd Gas Diesel Power Supply for control box 220V-240, single

stage 50-60Hz Minimum working temperature level 1200 oC 1 year spare parts bundle for total maintainability 10m pipe

pipeline. 1100 litre fuel Storage tank +pipeline system Containerised (the container will certainly act as housing) Additional chimney expansion

1 metre high One (1) year warranty.

Burner of 20 Kg: 03 Devices

Electrically controlled burner.

Two-compartment burner with an ability of 20 kg/ hour.

Incinerator with reduced maintenance and operating costs; Geared up with an automated control panel as well as very easy to make use of with

electro-magnetic locking of the door.

A primary waste reduction chamber of 900 ° C. A blog post second burning chamber of gases generated in the primary chamber

in the very least 1100 ° C.

Carbon residues in ash much less than 5% by weight based on European Directive 2000/76/ EC.

With refractory cellular lining in products of high quality
2/ (CIF Term) Price of shipping from manufacturing facility to PAPUA NEW GUINEA port of LAE, Morobe province
3/ Price of 2 Clover engineers to Supervise, Installation, Training our engineers and appointing the medical; waste

incinerator.

Categories:

Recent Posts