Combustion Efficiency 99.99percent
Retention time Of the flow pollutants less than 2 Sec in the hot part.
Excess Oxygen concentration Of primary combustion chamber 3-6% max.
Refractory The chambers should be lined with high thermal insulating refractory bricks with appropriate thickness and
with exceptionally temp. resistance. Less than 1400 C for the first combustion chamber, and not less than 1600 C to the
secandry combustion chamber, and at exactly the same time prevent the Temp. Of the exterior body of the room not higher than
70 C.
Doors Should be lined with the same bricks, and the edges lined with special suitable insulating material to prevent
any gas escaping, and the doors should be kept under negative pressure during the operation. Less than 99.9999 as per KEPA.
Wet System If the machine equiped with a CEMS washing the flow gasoline with water, then it should be made from
appropriate anti corrossion materials, and equiped with pH meter to measure and neutralize the water. It needs to be able to
use the water in closed recycled circuit many times before treating/ discharging into the sewage system in accordance
with KEPARS.
Chimney It should be appropriate with the capacity and the technical specifications, with height less than 12m from
ground level. With simple opennable sampling point equal about 3 inch, and the optimum sampling locations is at least 8D
downstream direction and 2D upstream from any flow disturbancies.
Sampling point Should be equiped with a platform situated down the sampling point by a distance less than 1 m, and
equiped with appropriate stairs from ground to the vent with comfortable slope.
Ash Removal It should be auto ash removal system.
Fuel It should be double system, such as gas and natural gas.
Feeding System Should be auto feeding system into primary chamber.
Control Room Should be equiped with a control panel displays Temp. Of the combustion burners, gas monitoring, digital
Temp. Indecation for the primary/secondary chambers, digital Temp. Indication for the gases…etc. it should be also
Auto operation, burnures on/off automobile lamps change, auto start/stop for air emission control system, automobile gas constant
monitoring system reading and print from gas emission parameters…etc..
Cooling System The primary chamber should be provided with automobile cooling systemthrough nozzles to permit direct cooling
if the Temp. Less than 500 C.
Flue cleaning and treatment To include a joint system (wet/dry), using water, lime, active carbon and ceramic
filters.
Quenching system/Heat exchanger Should be made and manufactured from anti rust and acid attack materials like
stainless steel 316 or equivalent.
Noise Level Not more than 85 dBA during regular operation.
Inaddition The desigh should insure that reactive fail-safe control systems are utilized.
The incinerator should be installed inside closed appropriate building with good aeration and ventilation system.
The building has facilities for off-loading of wastes from transport vehicles. Auto cleaning system for trucks and
waste containers, and cool storage area…etc..
The quotation should included list of original spare parts for 7 years.
The quotation should include supervising, beginning and training of the operators and ministry of health
engineers inside/outside Kuwait.
Detailed drawings, catalogs should be included.Our normal activities creates 2-5 tons of assorted waste
materials daily which range from condemned carcasses, and other wastes all that need to be incinerated at above
800Centigrade measured flue exhaust gas.
The quotation should include supervising, starting up and training of the operators and ministry of health
engineers inside/outside Kuwait.
Detailed drawings, catalogs should be included.Our normal activities generates 2-5 tons of assorted waste
materials per day which range from condemned carcasses, and other wastes all which need to be incinerated at above
800Centigrade measured flue exhaust gas.