Solid Waste Incinerators

5. The Contractor shall be responsible for all maintenance of the system, regular and periodical maintenance such as cleaning etc. during, upon completion, prior to and after inspection. The maintenance shall be in fully compliance with the authority requirements and satisfaction and shall be deemed included in the Contractor tender price and at no additional cost to the Client. The Contractor must submit to the S.O their proposed system package detail, which includes authority approval and an A4 or A3 preliminary dimensioned system design fitting into area allocated in the plan drawing.

7. For maintenance and services during Defect Liability Period, react interval to any criticism for the Contractor to attend shall be within 24hours

8. The Cremators package shall, inter alia, inclusive the following scope:

– Furnace Chamber and Afterburner

– Combustion System

– Control Panel

– Single refactory lined chimney for two cremators

– Flue Gas Sampling Platform

– Electrical wiring inside the system demands

– Raking Tools

– Ashbox

– Approval from DOE / Local Authority

– Any other scope/works required for the systems

3. All mechanical and eletrical works which includes but limited to supply, deliver and setup of all valves, penstock, screens, pumps, float swithces, flexible connector, pressure pipe works, mill, hot dipped galvanised lifting davits, air diffusers, hot dipped galvanised handrailings, hot dipped galvanised gratings, switch boards, cabling and wirings, lighting, earthing, metering, lighting protection, flow measurement and flow recorders, analyzing & comissioning and all necessary for proper completion and successful operational of the machine.

TOTAL CARRIED TO COLLECTION

Design and Construct approved gas cremation system
21.     Whether the place is a coastal area: [ ]Yes         [X ] No
13.     What’s the height of the chimney required? : No chimney is required. Flue length should be approximately 2-3 metres to connect to a downstream Procedure
19.     How soon do you require the machine to be delivered? : Sea Freight to Port of Cairns, Queensland, Australia in roughly Two months
The Contractor shall provide and fully comply with all requirements by the related jurisdiction during design phase, design approval, inspection and after inspection, handing over of the system package whether it is clearly shown or not but deemed necessary for successful completion and satisfaction to the jurisdiction. The Contractor must allow in his tender price all direct and indirect price at no extra cost to the Client for all such compliances.7.     Type of waste: Bio-medical / Hazardous / Municipal / Junk = ALL and Mixed
15.     Availability of power and type: Electricity if required
12.     Local incinerator operating and emission standards : India / EURO / US-EPA  Australia

The Contractor shall provide a Cremation System package for  TWO (02) Cremators and system accepted by related authority, which must fit into the allocated area as shown on the plan drawings. The work shall include but not limited to design preparation, authority layout approval, supply, fabricate, build, commissioning, testing, operational acceptance, provide training and also warranty of the system package. The work shall include all preliminaries, related structural and civil work, mechanical and electrical work and all outside work required for the proper completion and operational of the machine and as follows:The incinerator will be used to get a group of private multi profile hospitals.

The hourly-generated waste is about 100kg per hour, but with 1000kg daily quantity.

Due to the economic situation in Bulgaria now, our researches shows that a 100kg/hour system can fit the needs set from the project.

Please, offer us an Incinerator system that could match the parameters described above. We’re prepared to give information that is more comprehensive if you need such one. In the technical specifications of one merchandise we will need to have complete details of the parameters of exhaust gases, with all certificates you have about the environmental security regarding EU directives. All preliminaries which shall include but not limited to providing work insurances, taxes, mobilisation and demobilisation, contract management and oversight, design and professional fee, authority layout acceptance, operational approval, site preparation, temporary storage, health environmental safety and security, setting out, CIDB levy, duties, deposits, fees, charges, participation but not excluding only the bank guarantee to the jurisdiction JPP which shall be supplied by the Client, progress reporting and other required preliminaries for successful completion of the work.This type of incinerator is exactly what you’ve described as a ‘low temperature thermal decomposition incinerator’.  We can speed up the burning process by using hot air from a downstream process that may be fed back into the incinerator to elevate the burning temperature.

– Raking Tools

– Ashbox

– Approval from DOE / Local Authority

– Any other scope/works required for the systems

Categories:

Recent Posts